логотип компании BK Group

Large project for the Amur Gas Processing Plant of Gazprom

The scope of supply includes: high-purity and ultra-high-purity laboratory gases, a two-stage pressure reduction system by GasArc, containers for connecting gas cylinders to gas lines, gas lines made of electro-polished stainless steel pipelines 1/2'' and 1/4'' by Dockweiler, orbital machine welding of pipelines, gas detection in the laboratory and gas containers, an automatic hazardous gas shut-off system, a cylinder replacement alert system complete with execution design documentation.
LLC "BK Group"
Дербеневская наб., д. 7, стр. 2, Office 402 115114 Москва,
+7 (495) 118-41-95, info@bk-group.org


You may also be interested in